Case Study · Case Studies

Lindenmeyr Munroe: Moving a Northeast Distribution Center Onto a New Cisco Network

When Lindenmeyr Munroe relocated its Northeast distribution center and office to a 150,000+ sq ft building on Long Island, Solved IT installed 600+ Cat 6a cables, 12 armored multimode fiber cables, an MDF and five IDFs, Cisco network equipment and
Published October 16, 2026
Neatly dressed blue Cat 6a cabling in a wall-mounted network cabinet at Lindenmeyr Munroe, installed by Solved IT
Lindenmeyr Munroe logo
Lindenmeyr Munroe — Long Island, New York

Lindenmeyr Munroe is a family-owned distributor of paper, packaging, wide format and facility solutions, with more than 150 years in the business. When the company relocated its entire Northeast distribution center and office into a 150,000+ sq ft building on Long Island, Solved IT delivered the structured cabling, network closets, Cisco network equipment and Wi-Fi.

5.0
Rated 5 out of 5
150K+
sq ft

Distribution center and office, cabled and covered with Wi-Fi end to end

600+
Cat 6a

Cat 6a cable runs, plus 12 armored multimode fiber runs for the backbone

75+
APs

Cisco wireless access points across the warehouse floor

6
closets

One MDF and five IDFs, built out from scratch

THE CHALLENGE

Lindenmeyr Munroe was moving its entire Northeast distribution center and office into a new 150,000+ square foot building on Long Island. The network had to be built from the ground up and working before the move, because orders, shipping and the office team all depend on it. A building this size is demanding: distances are long, ceilings are high and steel racking gets in the way of wireless signals. The company needed one partner to design and install everything, from the cabling backbone and network closets to the Cisco switching and Wi-Fi across the entire floor.

WHAT SOLVED IT DID

Structured cabling at warehouse scale
We installed more than 600 Cat 6a cables across the facility, neatly dressed in every closet, with 12 armored multimode fiber cables forming the backbone between closets.

An MDF and five IDFs, built out from scratch
We built the main distribution frame and five intermediate distribution frames, so every part of the warehouse is within reach of a network closet, with clean cable management and clearly labeled switches.

Cisco network equipment installed
We installed the Cisco switching and network equipment in the MDF and every IDF and brought the whole network online, ready for the office and distribution teams to move in.

Wi-Fi across the whole floor
More than 75 Cisco wireless access points cover the warehouse, from the offices to the racking aisles.

Overhead cable runs across the 150,000+ sq ft Lindenmeyr Munroe warehouse, installed by Solved IT
Shape down purple

The Results

The Technology Behind This Engagement

Cisco Wireless
Cisco Switching
Cat 6a Cabling
Armored Fiber Backbone
MDF / IDF Build-Out
Facility Relocation

Relocating or Building Out a Facility?

Share this case study

Have a project like this?

Tell us about your space and goals. We’ll scope it, price it and give you a clear plan — no obligation.

More Client Stories

More Case Studies.

Contact Us

Whatever You’re Building, Securing, or Running — Let’s Talk.

Tell us about your project, your space or your day-to-day IT. We’ll review where you stand and give you a clear plan — no obligation, no sales pressure.

  • Managed IT and physical security
  • Flat-rate pricing — no surprise invoices
  • HIPAA & compliance-ready
  • Infrastructure and cabling experts
  • Under 1-hour response time
  • Local team. Real accountability.

What happens next?

1

We book a 20-minute call

At a time that works for you.

2

We assess your setup

And pinpoint the gaps that matter.

3

You get a clear plan

Written, priced and no strings attached.

Schedule a Free Consultation

★★★★★  Rated 5.0 on Google · Under 1-hour response · Local NYC team

or pick a time now